
Problem statement
- No objective control of metal purging with argon
Solution
Monitors and controls:
- metal purging with argon
- free board of the ladle
- technical condition of the ladle cover
- alloying and slag forming materials get into the ladle
- electrodynamic modes of work of electric arc unit
Effects
Reduction of argon consumption
Reducing the electricity consumption
Increasing the production safety
Increasing the quality of the end product

Other Solutions
Ladle slag detection
ABOUTEffects
- Guarantees the specified product quality
- Reducion sorting of metal
- Reduction the total amount of scrap
Metal temperature prediction model for steel-pouring and tundish ladles
ABOUTEffects
- Reduction of electrode and electric power supply consumption at the ladle furnace
Slag detection at BOF/EAF
ABOUTEffects
- Reduction of the consumption of ferroalloys and deoxidizers
- Reducing the duration of secondary treatment
- Increasing the quality of metal
- Reduction of electricity consumption